Ease of assembly
Buildings of the most general purposes (churches, garages, stations of the Ministry of Emergencies, etc.) are designed and manufactured on the basis of lightweight metal structures, taking into account local building codes in a particular country. Such buildings are assembled in the shortest possible time (from 2 to 4 weeks) with a minimum of heavy equipment. All elements of buildings are numbered, pre-cut to the desired length, holes are punched and all delivered in the form of a ready-made secure building kits.